Brand Name : Sussman
Model Number : SM-RP
Certification : CE ISO SGS
Place of Origin : Wuxi Jiangsu China
MOQ : 1 set
Price : negotiable
Payment Terms : T/T L/C
Supply Ability : 10 sets per months
Delivery Time : 65 days after deposit
Packaging Details : Standard packing
Type : Width Adjustable Wall Panel Roll Forming Machine
Thickness : 0.3mm-0.8mm
Max feeding width : 1070-1220mm
Rolling Speed : 10-12 m/min
Tile type : Colored Steel
Dimension(l*w*h) : 7500*1700*1600Mm
Width Adjustable Wall Panel Roll Forming Machine for PU Sandwich Line
Technical Data
| Items | Specifications | |
| Material of coil | Material Thickness | 03-0.8mm PPGI |
| Max feeding width | 1070-1220mm | |
| De-coiler | 5 ton hydraulic | Finished width from 700-1000mm adjustable |
| Forming system | Rolling Speed | 10-12 m/min |
| Roller Stations | About 18 stations | |
| Roller Material | Gcr15 Steel with quenching | |
| Shaft Material | 45# Steel Diameter 75mm shaft
| |
| Maim Motor Power | 7.5 kw | |
| Hydraulic cutting Power | 4 kw | |
| Moving- | LM rail ,Ball screw,-Hiwin | |
| Hydraulic Rexroth | system-Bosch | |
| Cutting system | Material Of Cutting | CR12 with quench treatment |
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Electrical control system | Electric Source | 380V, 60Z,3 phase
|
| Control System | PLC Panasonic |
Technological process:
Decoiler—Feedingwithguide—Cutting —Rollforming—Products collecting

Machine List:
| Machine list | 5 ton passive decoiler | 1 set |
| Hydraulic pre-cutting device | 1 set | |
| Main roll forming machine | 1 set | |
| PLC Control box | 1 unit | |
| Hydraulic station | 1 unit | |
| Out table | 2 units |
Profile Drawing:


Machine Show:

After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
|
|
Width Adjustable Wall Panel Roll Forming Machine for PU Sandwich Wall Panel Line Images |